Section 184 agreement - vehicle crossings over footways and verges
Section 184 of the Highways Act 1980 provides that a developer will need to enter an agreement for the construction of, or alterations to, any site access or accesses. It relates specifically to accesses where the work being done is all that is required to enable the development, or if the work needs to be done before the main works can proceed under a Section 38 agreement (adoption of highways) or a section 278 Agreement (allowing a developer to carry out works to a public highway).
The Local Highway Authority reviews and approves the agreements, and appropriate fees will be payable to them. A commuted sum may also be required for the Highway Authority to be able to maintain the works once they have been completed, usually for a fixed period between 10 and 25 years.
An agreement is necessary when a developer plans to construct or alter any site access or accesses to a public highway that is of a higher specification than something simple such as a dropped footway or verge crossing.
The scope of a Section 184 Agreement can be extended, in some instances, to cover additional minor works, such as relaying a short length of kerbing on either side of a new access, provision of street lighting for an access, or the re-positioning of a gully.
Section 38 agreement - adoption of highways, clauses can be incorporated into a Section 184 agreement where it is desirable that the highway contain both the land that is being dedicated as public highway by the developer as well as the access works, such as providing visibility splays.
As Section 184 does not provide for the formal entering into of agreements between a developer and Highway Authority, an Agreement should have regard to the following subsections:
- Subsection 3: The owner or occupier of land can be served notice by the Authority for the execution of the works.
- Subsection 7: The Authority can recover from the owner/occupier all expenses that are reasonably incurred from the works.
- Subsection 9: Any person named in a notice may offer to execute the works themselves in accordance with approved plans.
- Subsection 10: If subsection 9 is followed but the developer fails to comply with their offer, then the Authority can execute the works and recover expenses.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February